
Home > Demolition Montreal
Demolition in Montreal
Interior, exterior and concrete demolition, plus debris removal, in every borough of Montreal. Permits managed, CNESST compliance, RBQ license 5797-3208-01.
RBQ License
5797-3208-01
CNESST Certified
Job Site Safety
APCHQ Member
Provincial Association
Liability Insurance
$5,000,000
Demolition in Montreal
Your demolition company in Montreal
Kasa Demolition handles demolition in Montreal for homeowners and general contractors: interior demolition,exterior demolition,concrete demolition anddebris removal, in all 19 boroughs.
Permit management is included in the quote. No job starts before the permit is in hand.
Each borough has its own zoning regulations. From Plateau-Mont-Royal to LaSalle, through Westmount and Ahuntsic, Montreal's building stock is dense: plexes, triplexes, apartment buildings and semi-detached houses often share a party wall with the neighbour next door.
Some boroughs have their own demolition by-law. See, for example, our demolition in Anjou page and its by-law RCA 35.
This density calls for extra care: protecting adjacent areas, controlling dust with HEPA filtration when needed, and coordinating with neighbours before work begins.
Many Montreal buildings were built before 1990 and may contain asbestos in insulation, floor tiles or textured ceilings. An assessment is recommended before any demolition.

Services offered
Our demolition services in Montreal
Whether you need to clear out a kitchen, remove a deck or haul away job site debris, Kasa Demolition covers the full range of needs for Montreal homeowners and contractors.

Debris Removal
Fast, eco-responsible removal of construction debris and demolition materials throughout Montreal.
- Construction debris
- Demolition materials
- Sorted at certified facilities
- For homeowners and contractors

Interior Demolition
Kitchens, bathrooms, basements, partitions and floors demolished with HEPA filtration when needed to protect occupied spaces.
- Kitchen and bathroom
- Basement and partitions
- HEPA filtration available
- Permits reviewed at the quote stage

Exterior Demolition
Decks, balconies, sheds and garages demolished safely, with municipal permits managed from start to finish.
- Deck, terrace and balcony
- Shed and garage
- Facade and brick removal
- Municipal permits included
Free Quote
Ready to start your project?
Tell us about your project and we'll get back to you within 48 hours with a detailed estimate, no hidden fees.
Permits and regulations
Special permits that may be required in Montreal
Timelines by borough and file preparation are covered on our demolition permit page.
Demolition authorization certificate
If the work involves demolishing 50% or more of a building's floor area and exterior walls (25% or more for a heritage building), a demolition authorization certificate is required. The application is reviewed by the borough's demolition authorization review committee.
Transformation permit for interior demolition
When load-bearing walls, the structure, plumbing or electrical systems are affected, a transformation permit is generally required before work begins, even for interior demolition.
Borough-specific regulations
Montreal has 19 boroughs, each with its own zoning regulations and processing times. Requirements vary by area, particularly in heritage zones such as Westmount, Outremont or Plateau-Mont-Royal.
Notice to occupants and relocation conditions
For a residential building, the City requires proof that notice was given to tenants, along with a document outlining relocation conditions, as part of a demolition certificate application.
Process
How to get a demolition permit in Montreal
Kasa Demolition reviews the requirements that apply to your project and guides you through every step of the process with the city.
Project assessment
We determine the scope of the work and the borough involved to identify which permits apply.
Identifying the required permit
A transformation permit for work affecting the structure, or a demolition authorization certificate for an entire building.
Preparing and filing the application
Plans, photos and required documents are prepared and filed with the borough.
Following up on the application
Processing time varies by borough and can take 45 days or more for a demolition certificate.
Start of work
Once authorization is obtained, demolition begins according to the schedule agreed with you.
Useful resources
Helpful links for your application
After Demolition
Need to Rebuild?
Our sister company, Kasa Entrepreneur Général, is RBQ certified and specializes in turnkey renovation and post-disaster reconstruction in Montreal.
From demolition to final delivery, you have a single point of contact.
- Complete turnkey renovation
- Building permits handled
- Architects and engineers coordinated
- Projects from $25,000 to $600,000
- RBQ Certified 5797-3208-01




Our team
Why choose Kasa Demolition in Montreal?

01
A branch of Kasa Entrepreneur Général
The same standards as the parent company, and rebuilding possible within the same family of companies. A team that knows Montreal's building stock: plexes, apartment buildings and single-family homes.

02
CNESST-certified, trained crews
Strict safety protocols, HEPA filtration when needed, and personal protective equipment on every job site.

03
RBQ License 5797-3208-01
Bonding, warranty plan and $5,000,000 liability insurance to protect your project.

04
Service in French, English and Spanish
Clear communication with every client, in the language of their choice, at every stage of the project.
Other services
Other demolition services in Montreal
Kasa Demolition also offers specialized services to round out your project, from decontamination coordination to concrete demolition.

Concrete Demolition
Basement slabs, driveways, patios and block walls removed with specialized equipment, without damaging adjacent structures.
- Basement slabs
- Driveways and patios
- Concrete block walls
- Partial foundations

Decontamination: Asbestos and Mold
Coordination of asbestos, mold and lead assessment and removal before demolition, with CNESST-certified firms.
- Asbestos and lead
- Mold
- Vermiculite
- CNESST-certified firms

Junk Removal
Removal of furniture, appliances, mattresses and other large items. Ideal for clearing out a unit quickly before renovation work.
- Furniture and appliances
- Mattresses and electronics
- Full unit clear-outs
- Eco-responsible disposal
Free Quote
Ready to start your project?
Tell us about your project and we'll get back to you within 48 hours with a detailed estimate, no hidden fees.
FAQ
Frequently asked questions about demolition in Montreal
Here are answers to the questions Montreal homeowners and contractors ask most often before a demolition project.
For any question specific to your situation, contact Kasa Demolition directly at (514) 812-8763.
It depends on the scope of the work and the borough. If load-bearing walls or structural elements are affected, a transformation permit is generally required. For a demolition affecting 50% or more of a building's structure, a demolition authorization certificate is required. Kasa Demolition reviews the requirements that apply to your borough and guides you through the process.
Timelines vary depending on the borough and the type of permit required. A transformation permit for interior demolition can be processed within a few weeks, while a demolition authorization certificate reviewed by the borough's demolition committee can take 45 days or more. We assess your file as soon as you submit your request to give you a realistic timeline.
Buildings built before 1990 are more likely to contain asbestos in insulation, floor tiles or textured ceilings. Before any demolition, we recommend an assessment. If hazardous materials are detected, we coordinate with certified firms for decontamination before resuming the work.
Yes. We work in every borough of Montreal, from Verdun to Saint-Laurent, including Westmount, Outremont, Plateau-Mont-Royal and Rosemont. Each area has its own regulations, and we adapt our approach accordingly.
The price depends on the size of the space, the materials to be demolished, the method used, debris removal, your borough's regulations and the location. Kasa Demolition always provides a detailed quote after an on-site assessment.
Have a question specific to your project?
Contact usReady to get started
Start your demolition project in Montreal off right
Tell us about your project and we'll get back to you within 48 hours with a detailed assessment, no hidden fees.
