Kasa Demolition team on a demolition site in Montreal

Home > Demolition Montreal

Demolition in Montreal

Interior, exterior and concrete demolition, plus debris removal, in every borough of Montreal. Permits managed, CNESST compliance, RBQ license 5797-3208-01.

RBQ License

5797-3208-01

CNESST Certified

Job Site Safety

APCHQ Member

Provincial Association

Liability Insurance

$5,000,000

Demolition in Montreal

Your demolition company in Montreal

Kasa Demolition handles demolition in Montreal for homeowners and general contractors: interior demolition,exterior demolition,concrete demolition anddebris removal, in all 19 boroughs.

Permit management is included in the quote. No job starts before the permit is in hand.

Each borough has its own zoning regulations. From Plateau-Mont-Royal to LaSalle, through Westmount and Ahuntsic, Montreal's building stock is dense: plexes, triplexes, apartment buildings and semi-detached houses often share a party wall with the neighbour next door.

Some boroughs have their own demolition by-law. See, for example, our demolition in Anjou page and its by-law RCA 35.

This density calls for extra care: protecting adjacent areas, controlling dust with HEPA filtration when needed, and coordinating with neighbours before work begins.

Many Montreal buildings were built before 1990 and may contain asbestos in insulation, floor tiles or textured ceilings. An assessment is recommended before any demolition.

Get a Quote
Interior demolition of a residence in Montreal

Permits and regulations

Special permits that may be required in Montreal

Timelines by borough and file preparation are covered on our demolition permit page.

Demolition authorization certificate

If the work involves demolishing 50% or more of a building's floor area and exterior walls (25% or more for a heritage building), a demolition authorization certificate is required. The application is reviewed by the borough's demolition authorization review committee.

Transformation permit for interior demolition

When load-bearing walls, the structure, plumbing or electrical systems are affected, a transformation permit is generally required before work begins, even for interior demolition.

Borough-specific regulations

Montreal has 19 boroughs, each with its own zoning regulations and processing times. Requirements vary by area, particularly in heritage zones such as Westmount, Outremont or Plateau-Mont-Royal.

Notice to occupants and relocation conditions

For a residential building, the City requires proof that notice was given to tenants, along with a document outlining relocation conditions, as part of a demolition certificate application.

Process

How to get a demolition permit in Montreal

Kasa Demolition reviews the requirements that apply to your project and guides you through every step of the process with the city.

1

Project assessment

We determine the scope of the work and the borough involved to identify which permits apply.

2

Identifying the required permit

A transformation permit for work affecting the structure, or a demolition authorization certificate for an entire building.

3

Preparing and filing the application

Plans, photos and required documents are prepared and filed with the borough.

4

Following up on the application

Processing time varies by borough and can take 45 days or more for a demolition certificate.

5

Start of work

Once authorization is obtained, demolition begins according to the schedule agreed with you.

After Demolition

Need to Rebuild?

Our sister company, Kasa Entrepreneur Général, is RBQ certified and specializes in turnkey renovation and post-disaster reconstruction in Montreal.

From demolition to final delivery, you have a single point of contact.

  • Complete turnkey renovation
  • Building permits handled
  • Architects and engineers coordinated
  • Projects from $25,000 to $600,000
  • RBQ Certified 5797-3208-01
Start Your Project
Turnkey bathroom renovation by Kasa Entrepreneur Général in Montreal
Complete kitchen renovation by Kasa Entrepreneur Général in Montreal
Complete residential reconstruction after demolition in Montreal
Interior fit-out delivered by Kasa Entrepreneur Général in Montreal

Our team

Why choose Kasa Demolition in Montreal?

A branch of Kasa Entrepreneur Général

01

A branch of Kasa Entrepreneur Général

The same standards as the parent company, and rebuilding possible within the same family of companies. A team that knows Montreal's building stock: plexes, apartment buildings and single-family homes.

CNESST-certified, trained crews

02

CNESST-certified, trained crews

Strict safety protocols, HEPA filtration when needed, and personal protective equipment on every job site.

RBQ License 5797-3208-01

03

RBQ License 5797-3208-01

Bonding, warranty plan and $5,000,000 liability insurance to protect your project.

Service in French, English and Spanish

04

Service in French, English and Spanish

Clear communication with every client, in the language of their choice, at every stage of the project.

FAQ

Frequently asked questions about demolition in Montreal

Here are answers to the questions Montreal homeowners and contractors ask most often before a demolition project.

For any question specific to your situation, contact Kasa Demolition directly at (514) 812-8763.

Have a question specific to your project?

Contact us

Ready to get started

Start your demolition project in Montreal off right

Tell us about your project and we'll get back to you within 48 hours with a detailed assessment, no hidden fees.

Up to 5 photos of the space or what needs to come down. They are sent with your request.